Every lot is different, and that's exactly why a single price-per-square-foot number is misleading. The biggest swing factors on an infill build are site conditions, demolition, and finish level.

Site work and demolition. If there's an existing structure, demolition and disposal come first. Sloped lots, mature trees, and utility connections can each move the budget meaningfully.
Finish level. The same floor plan can land at very different price points depending on cabinetry, counters, flooring, and trim. We build fixed-scope packages so you know what you're getting.

The takeaway: get a realistic range up front. That's the entire point of our free lot evaluation — we walk the lot, talk through feasibility, and give you a budget range before you commit to anything.